Welcome, Guest!!
follow us on... Facebook twitter youtube rss

Author Topic: Filling in a moat  (Read 2905 times)

Yeoldedogg

  • Donator
  • Member
  • **
  • Posts: 143
    • View Profile
Filling in a moat
« on: December 08, 2013, 06:15:07 AM »
Looking for an estimate on getting the moat around Havocville completely filled with Lava.   Would like it planed to 72 all the way around and flooded.

Guess this would be a flush and flood really.

Rough estimate of blocks to be filled:   30,000
Rough location Cords: 4600,-13000 /72

Its a lot of lava, and would hate to have to empty the Nether...lol.  I've never tried to throw money at a problem..but this one...I think I'll save my finger tips.
« Last Edit: December 08, 2013, 06:16:46 AM by Yeoldedogg »

Fedgar_Lurch

  • Just Some Guy
  • Founder
  • Member
  • *****
  • Posts: 1408
  • Hey Guys!
    • View Profile
    • SentinelCraft
Re: Filling in a moat
« Reply #1 on: December 08, 2013, 06:19:19 AM »
So is the most already dug or do you need that done as well? I will be on tomorrow and we can talk specifics.
-- Fedgar

Yeoldedogg

  • Donator
  • Member
  • **
  • Posts: 143
    • View Profile
Re: Filling in a moat
« Reply #2 on: December 08, 2013, 07:09:03 PM »
The moat has been dredged of all Soil and gravel 99% of the way around.  This includes most subterranean layers.   If needed...I will dredge and plan off the needed layers for easy application of of chunks of lava.  I would landscape around the moat prior to application to meet a continuous level around both inside and exterior lining, if this would save time and money.

Yeoldedogg

  • Donator
  • Member
  • **
  • Posts: 143
    • View Profile
Re: Filling in a moat
« Reply #3 on: December 09, 2013, 12:58:48 AM »
Moat has been completed to beyond my expectations.  What I though would have been a cool idea, got a retro kick ass over the top job.  I look forward to our next dealing.

Thanks Fedgar!

Donation inbound.